VIP PACKAGE

Architectural Alteration Works
Demolition and Blockwork Works for Architectural Modifications.
Plumbing First Fix Works
Supply and Installation of Plumbing Rough-In Materials (Smart or Kassel for drainage and BR for water supply) for 1 Kitchen and 2 Bathrooms, with a 10-year warranty, including 1 concealed WC frame (Geberit/Smart type), and 1 concealed cistern unit with a unit price not exceeding 7,000 EGP.
Electrical First Fix Works
Supply and Installation of Electrical First Fix Materials including conduits and accessories (Abu El-Ezz brand or equivalent within the same price category), comprising 4 rolls 13–30 flexible corrugated conduits, 30 double boxes, 60 single boxes, 13 rolls 16 mm red conduit, 3 rolls 11 mm flexible conduit, 5 rolls 13 mm Abu El-Ezz flexible conduit, 4 additional rolls 13 mm flexible conduit, and 10 rolls medium 16 mm flexible conduit. The scope also includes 24-way Venus distribution board and antenna distribution board, up to 60 electrical points in total.
HVAC Works
Supply and Installation (per linear meter) of Air Conditioning First Fix Copper Piping (South African origin) for 3 spaces, total length not exceeding 25 linear meters, including electrical and drainage rough-in works for the remaining areas, including 4 mm² power cables.
Insulation Works
Insulation Works for Bathrooms and Kitchen, two coats of (SikaTop 107 or Construction Chemicals or Passive equivalent), total area not exceeding 25 m². The item includes surface preparation, cleaning, and skirting (upstands).
Plastering Works
Plaster Patching Works required for modifications, including bathroom and kitchen plastering (leveling, alignment, and squaring works).
Gypsum Board Works
Gypsum Board Works using Knauf white type for reception and bedrooms, total area not exceeding 60 m², and Knauf green (moisture-resistant) flat boards for bathrooms and kitchen, total area not exceeding 30 m².
Cable Pulling Works
Supply and Cable Pulling Works of Swedish-approved cables including 4 mm² wire for water heater and power sockets, 3 mm² wire for general sockets, 2 mm² wire for main lighting circuits, 1.5 mm² wire for spot lighting, and Italian satellite TV cable. The item includes all necessary workmanship, and excludes main feeder cable and instant water heater circuit.
Tiling Works
Supply and Installation of Egyptian Porcelain Tiles for the Living Room, unit price not exceeding 1000 EGP/m², installed over a concrete screed layer. The item includes adhesive materials, clips, grout (CetoFill), and all necessary workmanship for proper execution. Supply and Installation of First-Grade Laser-Cut Tiles, unit price not exceeding 300 EGP/m², for bedrooms, bathrooms, and kitchen. The item includes all necessary materials, workmanship, and grouting using CetoFill.
Marble Works
Supply and Installation of Egyptian Granite or Marble Window Sills, unit price not exceeding 1,000 EGP/m².Supply and Installation of Egyptian Granite Shower Floor, total area 2 m², unit price not exceeding 1,000 EGP/m². Supply and Installation of Marble Thresholds for Bedrooms and Apartment Entrance Door, unit price not exceeding 2,500 EGP/m²
Painting Works
Lump Sum Painting Works for Walls and Ceilings, including surface preparation (sanding), one coat of sealer, minimum four putty coats for walls, two putty coats for ceilings, and two coats of emulsion paint. The scope also includes cleaning works, painting of balcony balustrades, and all necessary works required for proper completion in accordance with industry standards and the supervising engineer’s instructions.
UPVC Works
Supply and Installation of Turkish UPVC Works for bedroom, bathroom, and kitchen windows, and terrace doors, using Kraft Line (AXA) or equivalent within the same price category, with total area not exceeding 12 m², including sliding insect screens for windows and doors.
Wooden Doors Works
Supply and Installation of 6 Pressed Wooden Doors (Swedish/Finnish type), veneered with natural oak (finger-jointed core), complete with frames (jambs) and all accessories, where accessory set price does not exceed 1,500 EGP per set, including wood stain (stain finish) painting for all doors.Supply and Installation of 1 Armored Security Door, unit price not exceeding 13,000 EGP.
Plumbing Sanitary Finishing Works
Supply and Installation of Sanitary Finishing Materials, including: 1 wall-hung WC unit, unit price not exceeding 5,000 EGP; 1 standard WC unit, unit price not exceeding 4,000 EGP; 5 mixers (1 kitchen sink, 2 bathroom basins, 2 shower mixers), unit price not exceeding 5,000 EGP each; fittings and accessories (valves and drains); 2 accessory sets, unit price not exceeding 1,800 EGP per set; 2 bathroom wash basins, unit price not exceeding 4,000 EGP each; 1 medium stainless-steel kitchen sink, unit price not exceeding 3,500 EGP; 2 shower glass partitions (Arab Union type), complete with accessories; 3 exhaust fans for kitchen and bathrooms, unit price not exceeding 1,500 EGP each; and 2 bathroom mirrors, unit price not exceeding 1,500 EGP each. In case of instant water heaters, their cost shall be added as an extra item if required.
Electrical Finishing Works
Supply and Installation of Sanitary Finishing Materials, including: 1 wall-hung WC unit, unit price not exceeding 5,000 EGP; 1 standard WC unit, unit price not exceeding 4,000 EGP; 5 mixers (1 kitchen sink, 2 bathroom basins, 2 shower mixers), unit price not exceeding 5,000 EGP each; fittings and accessories (valves and drains); 2 accessory sets, unit price not exceeding 1,800 EGP per set; 2 bathroom wash basins, unit price not exceeding 4,000 EGP each; 1 medium stainless-steel kitchen sink, unit price not exceeding 3,500 EGP; 2 shower glass partitions (Arab Union type), complete with accessories; 3 exhaust fans for kitchen and bathrooms, unit price not exceeding 1,500 EGP each; and 2 bathroom mirrors, unit price not exceeding 1,500 EGP each. In case of instant water heaters, their cost shall be added as an extra item if required.
Miscellaneous Costs
Labor, Storage, Cleaning, and Transportation.
  • In case the apartment is received with red brick walls, an additional 350 EGP per square meter will be added to the price.
  • An extra 150 EGP per square meter will be added if the client requests 3D MAX design services.
  • The finishing cost will be calculated based on the actual measured area after inspection, not the contractual registered area.
  • The minimum pricing area for the packages is 130 m² per apartment.